75th Street West Improvement Project

75th St W_FS_DRAFT_02.18.25

To download a copy of this document, click here.


Description and Scope of the Project

Design, permit, and construct an additional southbound left turn lane on 75th Street West, potentially a dedicated northbound right turn lane, and signal improvements to accommodate southbound dual left turn lanes and potentially the northbound dedicated right turn lane.

The design phase should include evaluating whether to construct a dedicated northbound right turn lane or if the combined through/right turn lane option is preferable.

Design to include pedestrian/bicycle and stormwater improvements where applicable. Modification of existing approach lanes, as needed, to accommodate the additional turn lanes.

Both steel mast arm assemblies may need to be relocated/replaced.

Land acquisition will be required.

To see the official website page on this project from Manatee County, click here.